Skip to content
IES Progress Report 2024 · Architectural Record Top 50 · 38,000+ luminaires shipped in 2024 · Avg lead time 8.7 business days
Specifier Resources · Vol. 17 High Point, NC · Updated Q4 2024

The working library behind every XXECIEL submittal — IES files, BIM families, and one assigned coordinator.

Photometric files, Revit/DIALux deliverables, DLC QPL lookups, Title 24 JA8 documentation, and installation guides for 1,200+ active SKUs. Every download is free. Every project is owned by a single named coordinator from first quote through final RFI — not a ticket queue, not a portal login.

Active SKUs in library
1,247
Avg. response on RFIs
3.2 hrs
Files behind a login wall
0
Resource Hub · 01–04

Four libraries. Every file free, no registration, no email gate.

A specifier should never have to fill out a form to download a photometric file. The four panels below are the working entry points for every XXECIEL submittal — pick a category and pull what you need in under a minute.

  1. 01 .IES · .LDT

    Photometric Files

    Measured .ies and .ldt files for every active SKU, generated on a 1.2m integrating sphere and Type C goniophotometer at the High Point lab. LM-79 reports and UGR tables included on request.

    • 1,247 active SKUs covered
    • LM-79 reports shipped on request
    • NIST-traceable calibration
  2. 02 RVT · RFA · DIALux

    BIM, Revit & DIALux

    Native Revit families, IFC exports, AutoCAD blocks, and DIALux plugins authored in-house for the Core, Linear, and Downlight collections. Updated within 5 business days of every catalog change.

    • Revit 2022–2025 families
    • DIALux evo & relux plugins
    • IFC 4.x for BIM coordinators
  3. 03 DLC · Title 24 · JA8

    Code & Compliance Lookup

    Cross-reference every SKU against DLC QPL, Title 24 JA8, and IECC 2024. 92% of the active catalog carries DLC Premium — the highest concentration among independent North American luminaire brands.

    • 92% DLC Premium coverage
    • Title 24 JA8 listed SKUs
    • IECC 2024 compliant data
  4. 04 PDF · ZIP · CAD

    Install Docs & Submittals

    Cut sheets, installation guides, dimmer compatibility lists, and pre-formatted submittal packages — bundled per fixture family so a contractor can drop the entire package onto a construction set in one pass.

    • Submittal-ready PDF bundles
    • Dimmer compatibility matrices
    • Field-replaceable driver guides

Can't find a file? Your project coordinator pulls archived SKUs (including 2020–2024 EOL lines) within one business day — no ticket, no queue.

Talk to Your Project Coordinator →
The XXECIEL photometric lab in High Point, NC — a 1.2m integrating sphere paired with a Type C goniophotometer, where every .ies and .ldt file is measured in-house.
Lab · High Point, NC · Est. 2009 Sphere ID: IS-1200-LM79-CAL-2024
In-House Photometric Lab

Measured in High Point. Not relabeled from a catalog PDF.

Every .ies, .ldt, Revit family, and DIALux plugin in the XXECIEL library is generated on-site — a 1.2-meter integrating sphere for flux and CCT, a Type C goniophotometer for distribution. The same engineers who measure the luminaire author the BIM deliverable, so a 4-inch downlight in your Revit model matches the file a contractor actually receives on site.

Integrating sphere
1.2 m · LM-79 / LM-80 traceable
Goniophotometer
Type C · C-plane 0–355°
94%
of catalog measured on-site · no third-party portals
0$
specifier charge for IES, Revit, or DIALux files
Compliance & Certification

Code Compliance Matrix

Scannable DLC Premium and Title 24 JA8 status across every active product family. Drop the SKU straight into your compliance form — verified against the current QPL and 2023 Title 24, Part 6.

Product Family SKU Series DLC Premium Title 24 JA8 IES Files BIM / Revit Notes
Core Series XX-CORE 1 / 2 / 4 Listed JA8 .ies · .ldt Revit · IFC 92% of catalog DLC Premium · highest concentration among independent NA brands.
Linear — Recessed XX-LIN R2 / R4 / R6 Listed JA8 .ies · .ldt Revit · IFC Continuous-row BIM family with mullion-aware joinery.
Linear — Pendant XX-LIN P4 / P8 Listed JA8 .ies · .ldt Revit Aircraft-cable & stem-mount variants share one photometric file.
Downlight XX-DL 3 / 4 / 6 Listed JA8 .ies · .ldt Revit · IFC Field-replaceable driver — under 90-second swap, no de-energizing of housing.
Cylinder XX-CYL 4 / 6 Listed Pending .ies · .ldt Revit JA8 listing in active QPL review — confirmed by coordinator on request.
Wall Washer XX-WW 2 / 4 Listed JA8 .ies · .ldt Revit Asymmetric optic documented with separate wall-wash .ies file.
Track & Spotlight XX-TRK / XX-SP 3 Standard JA8 .ies · .ldt Revit DLC Premium renewal pending Q2 cycle — confirm status with coordinator.
Tunable White XX-TW 4 / LIN-TW Listed JA8 .ies · .ldt Revit · IFC 2700K–6500K & 1800K–4000K dual-channel driver profiles included.

All listings verified weekly against the DLC QPL and California Energy Commission Title 24, Part 6 database. Last sync: 12 days ago. Request a printed compliance packet with notary-stamped QPL screenshots for sealed drawings.

Service Model

One assigned coordinator. From first quote to final punch-list.

XXECIEL does not run a ticket queue. Every specification, every submittal, every RFI on a project is owned by a single named human who knows the drawings, the contractor, and the schedule.

1
Coordinator per project — not a call-center rotation.
4 hr
Median RFI turnaround during business hours, measured across 2024.
98.4%
On-time-in-full delivery across 12,400+ shipments in 2024.
8.7 d
Average lead time against an industry average of 28 days.

“We stopped chasing rep callbacks mid-RFI. XXECIEL’s coordinator already had the answer in our project channel before we sent the email.” — Senior lighting designer, 2024 third-party DesignIntelligence survey (NPS 74)

Talk to Your Project Coordinator
Specifier FAQ

Answers before you submit the spec.

The five questions lighting designers and electrical contractors actually ask before they request a submittal package. Plain technical language — if something is missing, your coordinator picks up the thread.

Is the 10-business-day lead time contractual?

Yes — every quote from XXECIEL carries a written ship date against a documented 10-business-day standard for the Core, Linear, and Downlight collections. In 2024 we hit that window on 98.4% of 12,400+ shipments; the remaining 1.6% triggered a pre-agreed written notice and a revised dock date, not a surprise on the day of delivery. Custom finishes and non-standard CCTs add 5–7 business days, quoted up front.

What photometric and BIM formats ship with every SKU?

Every active SKU ships with a full photometric package at no charge: native .ies (North America), .ldt (Europe), a measured polar plot, and a candela table. BIM deliverables include a native Revit 2024 family, an IFC export, and a DIALux plugin. Files are generated by our in-house IES photometric lab in High Point, NC — not outsourced — and are re-measured whenever the LED package is revised.

How fast does the project coordinator respond to RFIs?

Median response during business hours is under four hours across the 2024 record. RFIs submitted after 4pm ET are acknowledged the same day with either an answer or a written hold time. Submittal package requests ship within one business day; complex value-engineering alternates get a written response within two. Your coordinator’s direct line is on every shipping packet and every submittal cover sheet.

Can I spec a custom color temperature or CRI without breaking lead time?

Most custom CCTs (2200K–6500K) and CRI values up to 97 are stocked at the driver level and ship on the standard 10-business-day clock. Truly custom chromaticity coordinates, single-bin tight-tolerance LEDs, or specialty Duv targets add 5–7 business days — confirmed in writing before the PO is released. Your coordinator runs the photometric impact and reports the delta against the base spec.

What is the field-service story if a driver fails after occupancy?

Every Core Series fixture carries a lifetime driver warranty. Drivers are field-replaceable, swappable in under 90 seconds without de-energizing the housing, and stocked as service parts in High Point for next-business-day shipment anywhere in the contiguous US. Electrical contractors receive a printed service procedure and the torque spec for the housing cap with every order — no firmware, no proprietary tools.

Have a question that is not covered? Your coordinator picks up the thread the moment you reach out — no call-center menu, no ticket number.

Talk to Your Project Coordinator