Skip to content
IES Progress Report 2024 · Architectural Record Top 50 · 38,000+ luminaires shipped in 2024 · Avg lead time 8.7 business days
Spec Desk · High Point, NC

Direct line to the XXECIEL spec desk. Handled by a named coordinator — not a call center queue.

Tell us the project. We return a complete Specification Packet — photometric files, BIM/Revit families, DIALux plugins, lead-time confirmation — within one business day, assigned to a single coordinator who owns the submittal through project closeout.

  • 1,800+ completed projects · North America
  • 98.4% on-time-in-full · 12,400 shipments in 2024
  • 8.7-day average lead time vs. 28-day industry average
Photometric polar plot for a Core Series downlight
In-house IES Photometric Lab Sample polar curve · Core 4" Downlight · 3000K · 90 CRI
Project Intake

Request a Specification Packet

A coordinator replies within one business day with a scoped submittal.

Download IES Files →

By submitting, you agree to be contacted by XXECIEL regarding your project. We do not share project data with third parties.

What Happens After You Submit

A named coordinator, a measurable response, and a packet engineered for your project — not a generic brochure.

  1. 01

    Assigned within one business day

    Your submission is routed to a single named project coordinator who owns every quote, submittal package, and RFI for the life of the project — not a call-center rotation.

    • Avg. reply6h 12m
    • SLA1 business day
  2. 02

    Scoped Specification Packet delivered

    You receive a submittal-ready packet: cut sheets, .ies and .ldt photometric files, BIM/Revit families, DIALux plugins, DLC Premium and Title 24 JA8 status, and a fixed lead-time quote — at no charge.

    • Files includedIES · LDT · RFA · DIALux
    • 92% DLC Premiumof active catalog
  3. 03

    Shipped on schedule — or it's on us

    Standard Core, Linear, and Downlight collections ship in 10 business days against a verified 98.4% on-time-in-full rate across 12,400+ shipments in 2024. Lifetime driver warranty on every Core Series fixture.

    • Lead time8.7 days avg.
    • OTIF 202498.4%
Direct Channels

If you'd rather talk to a person than fill out a form.

Three direct routes to the High Point spec desk — pick whichever fits your workflow.

01 · Phone

Call the spec desk

Speak with a coordinator during East Coast business hours. Best for fast scoping on active bids and contractor rush orders.

+1 (336) 555-0418 →
Hours
Mon–Fri · 8:00–18:00 ET
Avg. pickup
Under 20 seconds
02 · Email

[email protected]

Routed directly to the submittals queue with an auto-assigned coordinator. Ideal for attaching drawings, RFPs, and prior submittals to reply to.

[email protected]
Reply SLA
One business day
Routing
Auto-assigned coordinator
03 · Rep Agency

Find your local rep

For distributor partners and specifying architects in territories outside High Point's direct coverage, our rep network handles quoting, samples, and on-site support.

Locate a rep agency →
Coverage
US · CA · MX
Active agencies
42 territories
Established · Certified · Specified
DLC Premium · 92% of catalog / Title 24 JA8 compliant / IES Progress Report · 2023 & 2024 / Architectural Record Top 50 · 2022 & 2024 / AIA Honor Award · Mercer Civic Tower, 2024 / DesignIntelligence NPS · 74 among specifiers / 1,800+ completed projects / 38,000+ luminaires shipped in 2024 / Family-owned since 2007 / DLC Premium · 92% of catalog / Title 24 JA8 compliant / IES Progress Report · 2023 & 2024 / Architectural Record Top 50 · 2022 & 2024 / AIA Honor Award · Mercer Civic Tower, 2024 / DesignIntelligence NPS · 74 among specifiers / 1,800+ completed projects / 38,000+ luminaires shipped in 2024 / Family-owned since 2007
Pre-Flight Checklist

Have these ready before you submit — so your coordinator can return a usable submittal on the first reply.

A typical first-pass submittal takes one exchange when the intake below is complete. Missing items add a round-trip.

Project context

  • 01
    Project name and address. Allows the coordinator to verify Title 24 JA8 and local code applicability, and to check rep coverage for the project zip.
  • 02
    Sector. Office, hospitality, retail, healthcare, education, civic, multifamily — determines driver and finish spec defaults.
  • 03
    Project phase and target timeline. Bidding, schematic, DD, CD, or immediate replacement — sets the lead-time confirmation we can hold against.

Scope

  • 04
    Fixture families of interest. Select one or more from Core, Linear, Downlight, Cylinder, Track, Step/Cove, Exterior, or Custom.
  • 05
    Estimated fixture count. Even a rough order of magnitude unlocks volume pricing tiers and reserved factory slots.
  • 06
    Scope notes. Mounting conditions, ceiling type, controls integration (0–10V, DALI, wireless), finish requirements, and any non-standard certifications.
Optional but useful

Floor plans, reflected ceiling plans, or a prior submittal to reply to can be attached when you email [email protected] directly. The coordinator will attach them to your project file.