Skip to content
IES Progress Report 2024 · Architectural Record Top 50 · 38,000+ luminaires shipped in 2024 · Avg lead time 8.7 business days
Project Index  /  Volume 06

Projects

1,800+ completed specifications across North America, 2018–2024. Five sectors. Two featured commissions, including the 2024 AIA Honor Award–winning Mercer Civic Tower and the Hilton Lumen prototype rollout.

1,847 Projects on file
38,420 Luminaires shipped, 2024
5 Sectors served
7 Years indexed
Filter by sector

Five sectors. Forty-two sub-typologies. One catalog.

Locate a precedent that matches the typology you are currently specifying. Counts reflect completed projects on file through Q4 2024.

Sub-typology breakouts available on request. Each sector ships with a dedicated photometric binder and BIM family bundle at no charge to the specifier.

By the numbers  /  2024 performance

Every project is a deliverable, not a lead.

  • 1,847 completed Projects on file across North America, 2007–2024
  • 38,420 shipped Luminaires delivered in 2024 across Core, Linear, and Downlight families
  • 98.4% on-time-in-full Delivery rate across 12,400+ verified shipments in 2024
  • 8.7 business days Average lead time from PO release to dock, against an industry average of 28 days

Source: XXECIEL shipping audit, calendar year 2024. Industry average reflects publicly reported figures from three peer manufacturers.

Specifier note  /  2024 project review

“The photometric files and BIM families landed the same day as the cut sheets. We turned the construction set in eleven days instead of six weeks, and the field-replaceable driver sealed the deal with the GC.”

Maren K. Halloway, IALD Principal Lighting Designer, Castellani Lighting Studio On the Mercer Civic Tower submittal, Atlanta · 2024